Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-plugin-bluehost domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/pgtoclmy/public_html/website_110c46f5/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/pgtoclmy/public_html/website_110c46f5/wp-includes/functions.php on line 6114
{"id":622,"date":"2022-03-07T06:59:34","date_gmt":"2022-03-07T02:59:34","guid":{"rendered":"https:\/\/www.triangleshipyard.com\/?post_type=highlights&p=622"},"modified":"2022-09-24T16:05:21","modified_gmt":"2022-09-24T12:05:21","slug":"sms-essa","status":"publish","type":"highlights","link":"https:\/\/triangleshipyard.com\/highlights\/sms-essa\/","title":{"rendered":"SMS ESSA"},"content":{"rendered":"\n

DRILLING JACK UP BARGE<\/strong><\/p>\n\n\n\n

LENGTH <\/strong><\/td>72 M <\/td><\/tr>
BREADTH<\/strong><\/td>62 M<\/td><\/tr>
DWT<\/strong><\/td>8237 T<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n

<\/p>\n\n\n\n

TRIANGLE SHIPYARD<\/strong> Successfully completed major piping and steel jobs on ADNOC<\/strong> chartered jack up barge SMS ESSA.
The Steel structures and Piping jobs were done in accordance with the owner class approved drawings to meet the needs and standards of ADNOC.
Hence ensuring highest standards of workmanship from the team. Major jobs included:
Fabrication and Installation of Mud Hopper Line, Fabrication of Burner Boom Rest, Fabrication and Installation of Platform for Compressor, Fire Line Extensions,
Fabrication and Welding of Gangway Supports, Fabrication of Pad Eye.
Our quality of works, timely completion and economical pricing has once again ensured the highest level of customer satisfaction.
Our aim is to be the most reliable service provider to the marine and offshore industry and this is what we ensure with every project that we take up.<\/p>\n\n\n\n



<\/p>\n\n\n\n

<\/p>\n\n\n\n