MV Gebal
Offshore Supply Vessel
LENGTH | 41 M |
BREADTH | 8 M |
DWT | 176 T |
From A to Z, the Scope of work was completed within 600 working hours.
- Docking/Undocking
- Hull treatment, hydro-blasting, steel job, paint job.
- Mechanics, propeller, bow thruster.
- Valves overhauling.
- Pipes renewal.
- Electrical.