Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/pgtoclmy/public_html/website_110c46f5/wp-includes/functions.php on line 6114
Seafox Matsu - TRIANGLE SHIPYARD

Seafox Matsu

Offshore Jack Up

LENGTH 76 M
BREADTH36 M
DWT6000 T

The Major Job included, but not limited to:

• Removal of 17 accommodation Containers – getting the platform back to the original GA for their next charter
• Including – removal of complete – Laundry, Galley, Structure, Pipe Lines, AC Ducting Etc.
• The job was carried out using yard provided 350 T crane and Heavy rigging was involved.