Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/pgtoclmy/public_html/website_110c46f5/wp-includes/functions.php on line 6114
MV Gebal - TRIANGLE SHIPYARD

MV Gebal

Offshore Supply Vessel

LENGTH 41 M
BREADTH8 M
DWT176 T

From A to Z, the Scope of work was completed within 600 working hours.

  • Docking/Undocking
  • Hull treatment, hydro-blasting, steel job, paint job.
  • Mechanics, propeller, bow thruster.
  • Valves overhauling.
  • Pipes renewal.
  • Electrical.