Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/pgtoclmy/public_html/website_110c46f5/wp-includes/functions.php on line 6114
SEAFOX 8 - TRIANGLE SHIPYARD

SEAFOX 8

 An offshore self propelled-elevating mobile unit

LENGTH 69 M
BREADTH43M
DWT

TRIANGLE SHIPYARD was awarded the project for installation of FIFI Unit for the jack up unit Seafox 8, by SEAFOX, one of the major clients of Triangle Shipyard.
The job was carried out professionally by the fabrication and welding team, manufacturing the FIFI Platform and pipes in our workshop and installation on the unit along with submersible and booster pumps followed by a successful test run at our facility in DMC.
The project was completed to full satisfaction and expectation of the client, who is one of the leading offshore support jack-up company in the world.