Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/pgtoclmy/public_html/website_110c46f5/wp-includes/functions.php on line 6114
ZAKHER CREST - TRIANGLE SHIPYARD

ZAKHER CREST

Offshore Tug/Supply Ship

Deadweight (t)1500
Length Overall (m)60
Beam (m)14

Triangle Shipyard and Zakher Marine International; together, achieved many state-of-the-art projects.

One of them was the special survey of Zakher Crest. Dry docking repairs/procedures include:

  • Hull treatment.
  • Fabrication and welding.
  • Mechanical jobs.
  • Electrical jobs.
  • Carpentry.
  • Pipelines renewal.