MFS GOLD
Offshore Tug/Supply Ship
Deadweight (t) | 1450 |
Length Overall (m) | 57 |
Beam (m) | 14 |
Triangle Shipyard delivered the special survey work list of MFS Gold as per the international standard and Dubai Maritime City regulations. The scope of work covered the following areas:
- Hull treatment.
- Steelwork.
- Pipelines renewal.
- Caterpillar main engines overhauling.
- Caterpillar auxiliary engines overhauling.
- Valves, pumps, and coolers overhauling.
- Fix pitch propeller and shaft.
- Bow thruster.