Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/pgtoclmy/public_html/website_110c46f5/wp-includes/functions.php on line 6114
RAWABI 7 - TRIANGLE SHIPYARD

RAWABI 7

Offshore Tug/Supply Ship

Deadweight (t)1298
Length Overall (m)59
Beam (m)15

Triangle Shipyard stands by our client’s requirements no matter how challenging they can look. This particular task required special design and delicate build of a major component to be delivered in standard time and specifications. Proudly, this additional compartment was created from A to Z by the Triangle Shipyard team alone and within our premises.